The lower wing skin is now complete except for a couple of inspection and drain holes which will be installed prior to the epoxy varnish coating. The wing needs to be rolled over to give access to the upper side. This will likely take place in early February. The wing will then go […]
Daily Archives: 18 January 2016
1 post