March 2017 saw the much anticipated structural test of the wing after the completion of its extensive five year repair. Happily, the test consisting of placing 2000 kg on each outer wing section, went well. Following the test doped fabric covering was applied the to the six metre re-built section […]
Monthly Archives: March 2018
1 post